Compliance West MP-D5-PF

$25,837.78

In stock

Surge Tester D5-PF, IEC 60601-2-27 Ed 3.0

Compare
SKU: Order #: MP-D5-PF

Product Highlights

  • Direct Joules readout on front panel after Energy Reduction Test.
  • Increased accuracy in accordance with IEC 60601-2-25 and -2-27:2011 requirements.
  • 20 second period between pulse delivery
  • Increased signal generator voltage for -2-27 tests (Order Option SG).
  • Integrated Pass/Fail reference for checking the equipment and test setup.
  • Dry Capacitor delivers >2.5M pulses at 20 second intervals.
  • Integrated energy measurement, see demonstration video.
  • USB Testminder, Computer Control.
  • External interlock, disables HV output and defeats test when circuit is open.
  • Ergonomically designed for safety, speed and efficiency.
  • Front panel indicates polarity
  • Output voltage and polarity are controlled manually on front panel or via TestLink.
  • Cables, manual and calibration certificate included.
  • One year calibration cycle.
  • One year warranty.
Add your review

Your email address will not be published. Required fields are marked *

Reviews

There are no reviews yet.

Shopping Cart 0

No products in the cart.